Home / Applications / Industrial marking

Industrial marking & traceability

The part keeps
its identity.

Serial numbers, codes and permanent identification. Match the marking process to the metal, the finish and the information that needs to survive.

Cougartron MK310 laser-marked logo and QR code on a welded metal sample

Laser · detail & codes

Actual MK310 sample: logo and QR marking.

DotTrax stylus beside indented lettering on a metal test piece

Dot peen · physical depth

Actual DotTrax example: indented lettering.

Electrochemically marked animal logo on a steel knife blade

Electrochemical · stencil marks

Actual stencil-marking example: logo on a blade.

Laser detail, dot peen depth and electrochemical stencil marking—shown on Cougartron metal samples.

Three technologies. Different strengths.

Choose what the mark
needs to do.

For OEM manufacturers, production engineers and quality teams, the right starting point is the part—not the machine. Compare the result, workflow and permitted surface change.

01 / LASER

Detail without a stencil

The mark

A focused beam changes or removes material at the surface. Contrast and depth depend on the metal, finish and settings.

Choose it for

Variable serial numbers, compact codes, logos and detailed layouts on suitable materials.

Check first

Surface response, mark contrast and reader performance. Plan laser safety and fume control.

02 / DOT PEEN

An identity in the metal

The mark

A stylus indents the surface with a pattern of dots. The mark has physical depth.

Choose it for

Identification on suitable metal parts where indentation is acceptable, including work marked before coating.

Check first

Material hardness, support and permitted deformation. Thin or highly stressed parts need engineering review.

03 / ELECTROCHEMICAL

A repeatable stencil workflow

The mark

Electricity and a matched electrolyte transfer the stencil pattern onto a conductive metal surface.

Choose it for

Repeated logos and text on suitable metals, particularly stainless steel. Printed stencils can also carry variable data.

Check first

Stencil and fluid compatibility, residue removal and surface requirements. Frequent data changes add stencil-handling work.

Application selection

Which process should
you test first?

Find the requirement closest to your job, then compare the options on your material and finish.

Discuss an unusual part →

Mild steel that will be painted or powder coated

Start by testing dot peen if the design permits an indentation. Put the marked sample through the actual preparation and coating sequence. Thick coatings can fill the mark; check final readability with your production reader.

Small codes or serial numbers that change for every part

Start by testing laser marking. Define the code type, size, data format and required contrast. Dot peen may also suit robust parts that permit indentation. Confirm the specific machine’s code and software capabilities.

The same logo or text repeated on stainless parts

Consider electrochemical marking. A reusable stencil can suit repeated designs. Choose the electrolyte for the metal and follow the specified neutralization and residue-removal procedure. Compare stencil options →

A coated, anodized, thin or surface-critical component

Test the actual finish first. Laser marking may change or remove a coating; dot peen deforms the substrate. Electrochemical marking needs a suitable conductive surface and compatible chemistry. Agree the mark location and permitted surface change before selecting equipment.

Marking and the finishing sequence

Before coating. After coating.
Different decisions.

Mark before the finish

Mark → Prepare → Coat → Read

Dot peen can put identification into mild steel before painting. Depth, layout, surface preparation and coating thickness must work together.

Test the finished part. A clear mark on bare steel does not prove it will remain readable—or scannable—under the coating.

Mark after the finish

Prepare → Coat → Mark → Inspect

Marking afterward avoids covering the identifier, but may alter or remove the protective finish locally. Confirm the coating and substrate response.

Agree the surface requirement. Check corrosion protection and the permitted marking location, especially on specification-controlled parts.

Close view of the real MK310 logo and QR marking sample

Codes & production identification

A code you can see.
A code you can read.

QR and Data Matrix need more than a visible pattern. Reader, lighting, code dimensions, surface and marking method all affect the result. Check after finishing and under realistic service conditions.

DotTrax P100 lists QR and Data Matrix support. MK310 lists QR marking; confirm the required Data Matrix workflow before specifying it.

A successful scan is not formal code verification. Include any customer-specified code grade and verification method in the sample test.

01

Assign

Define the identifier and prevent duplicate numbers.

02

Mark

Position the part and apply the approved layout.

03

Read

Check the result and define how failed marks are handled.

04

Record

Link the identifier to the correct production or quality record.

Equipment to evaluate

Match the machine
to the marking job.

Cougartron MK310 portable laser marking machine

MK310 laser marker

For variable identification, logos and QR codes on suitable parts. A portable setup lets the marker move to larger components; assess fixtures for repeat work.

Explore MK310 →

30 W fiber laser
Integrated touchscreen
Confirm regional version and accessories

Cougartron DotTrax P100 cordless dot peen marker

DotTrax P100

For metal identification where physical depth matters and impact marking is permitted. Test before coating using the actual material and finish.

Explore DotTrax P100 →

Cordless 18 V
100 × 30 mm marking area
QR and Data Matrix listed

Cougartron MK612 electrochemical marking system and accessories

Electrochemical systems

For a stencil-based workflow on compatible conductive metals. Compare MK12, MK612 or an approved marking set for your existing Cougartron weld cleaner.

Compare marking systems →

Stencil + electrolyte
Match fluid to the metal
Plan residue removal

Cougartron MK310 marking head positioned on a metal component

See the equipment in use

Watch MK310 marking.

See the MK310 marking workflow, then arrange a demonstration on your own part.

Use a risk-assessed laser-marking area with suitable protective measures and fume control. The handheld shield alone does not establish a safe workstation.

Before you specify

Practical marking questions.

Which method is best for mild steel?

There is no universal winner. Dot peen is worth testing where depth matters. Laser marking may suit other requirements for detail, codes or production. The coating and finishing sequence can decide the answer.

Can DotTrax mark Data Matrix codes?

The P100 product page lists Data Matrix and QR support. Test the completed code on the actual part, particularly if it will be painted or treated afterward.

Can MK310 mark every metal and coating?

MK310 marks a broad range of materials. The alloy, surface condition and finish affect contrast and depth, so test your part to select the right settings.

Is dot peen suitable for every metal part?

No. Impact marking can be inappropriate for thin, highly stressed, safety-critical or specification-controlled components without engineering approval.

Can we connect marking to our ERP or production line?

Tell us your data source, required interface, cycle time and workstation arrangement so we can assess the right setup and confirm the available integration options.

Sample marking enquiry

Your part. Your finish.
Let’s test the mark.

Send a photograph or drawing and the information you need on the part. We’ll help you choose a useful trial and the equipment to evaluate.

01 / The part

Metal grade, dimensions, surface condition and marking location. Include the coating and what happens after marking.

02 / The information

Text, logo or code, mark size and variable data. Include the data source and any required interface.

03 / The acceptance test

Required workload, measured cycle time, readability after finishing and any specified code-verification method.